筑纬建筑科技ZHUWEI

Pudong Zhoupu West Community PDP0-1001 Unit Plot 08-04 Primary School

Prefabricated Design · Education · Kangqiao Town, Pudong New Area, Shanghai

Pudong Zhoupu West Community PDP0-1001 Unit Plot 08-04 Primary School

In Kangqiao Town, Pudong New Area — Kangwu Road east, Baiqu Port south, Quqiao Road west, planned green space north — on a site of approx. 2.56 hectares. A new teaching complex with a partial one-level basement and four above-ground floors plus a gatehouse, for 35 classes — a modern, well-equipped primary school for surrounding communities. Moka precast walls are built from modular Moka blocks interlocked and stacked per module, reinforced and grouted to structural requirements — typically used for exterior envelopes, with self-insulation, waterproofing and fire resistance.

Project Profile

Business Segment
Prefabricated Design
Building Type
Education
Location
Kangqiao Town, Pudong New Area, Shanghai
Floor Area
25,600 m² (above ground)
Scope of Services
Monolithic precast frame structure with Moka-block assembled precast exterior walls | precast composite beams, precast composite slabs, precast staircases (applied to beams and slabs of horizontal floor structures) | Precast & assembly ratio at least 40% per building
Note
Precast & assembly ratio at least 40% per building
Design Consultant
Zhuwei Architectural Technology

Related Projects

RELATEDAll projects →