筑纬建筑科技ZHUWEI

Notice of the Anhui Provincial Housing and Urban-Rural Development Department on Carrying Out BIM Review of Construction Drawings

WeChat Sync · Xiaowei · 2025-02-14


The following article is sourced from the Department of Housing and Urban-Rural Development of Anhui Province, author EaBIM Editor






Notice of the Anhui Provincial Housing and Urban-Rural Development Department on Carrying Out BIM Review of Construction Drawings


Jian Biao Han [2025] No. 47

To the housing and urban-rural development bureaus (urban-rural construction bureaus) of all cities, and the housing and urban-rural development bureaus of Guangde City and Susong County:
In order to implement the requirements of our department's Implementation Opinions on Promoting the Application of Building Information Model Technology (Jian Biao Gui [2024] No. 4) and accelerate the application of building information model technology, our department has built the Anhui Province BIM Review Platform. Matters concerning the implementation of construction drawing BIM review are hereby notified as follows:


I. Review Scope
According to the Implementation Opinions on Promoting the Application of Building Information Model Technology (Jian Biao Gui [2024] No. 4), starting from February 1, 2025, newly approved government-invested large public buildings, underground garages larger than 10,000 square meters, three-star green buildings, prefabricated buildings, and utility tunnels in our province shall undergo construction drawing BIM review.
Starting from January 1, 2026, newly approved large public buildings, underground garages larger than 10,000 square meters, two-star and above green buildings, prefabricated buildings, utility tunnels, rail transit, and urban interchanges in our province shall undergo construction drawing BIM review.
Starting from January 1, 2027, newly approved large building construction projects and municipal engineering projects in our province shall undergo construction drawing BIM review.


II. Review Process and Requirements
(1) Preparation of BIM design deliverables. Engineering projects within the review scope shall build BIM models in accordance with the Technical Standard for Building Information Model (BIM) Review of Building Construction Projects (2025 Edition) issued by our department and the relevant requirements of the Application Guide for Building Information Model DB34/T 4714-2024, and carry out drawing-model verification, integrated pipeline scheme design, and visual presentation. Meanwhile, BIM design deliverables shall be self-checked before the project is submitted for review, and a BIM self-check report shall be completed.
(2) BIM project declaration. The project owner shall log in to the engineering reform system to declare the BIM project, identify it as a BIM project, and upload the BIM design deliverables to the original 2D construction drawing review system in accordance with the requirements of the Technical Standard for Building Information Model (BIM) Review of Building Construction Projects (2025 Edition).
(3) BIM project review. Construction drawing review agencies shall log in to the Anhui Province BIM Review Platform (URL: http://tushen.k2067780.top:88/) and review the project's BIM design deliverables in accordance with the requirements of the Technical Standard for Building Information Model (BIM) Review of Building Construction Projects (2025 Edition), issue BIM review opinions, and incorporate the review opinions into the joint review opinion of the construction drawing design documents. The project owner shall revise and improve the BIM design deliverable files accordingly based on the BIM review opinions. 2D construction drawings shall still be reviewed in the original manner.


III. Safeguard Measures
(1) Strengthen in-process and post-event supervision. Housing and urban-rural development authorities in all localities shall fully recognize the importance of carrying out BIM review and improve in-process and post-event supervision measures.
(2) Strengthen funding support. BIM review fees have been included in our province's construction engineering budget quota; fees may be calculated with reference to the Reference Basis for Building Information Model (BIM) Review Fees in Anhui Province.
(3) Strengthen publicity and training. Relevant units shall increase publicity efforts on BIM review and accelerate the improvement of BIM technology application capabilities of project owners and design firms, as well as the BIM review capabilities of construction drawing review agencies.
(4) Accelerate the application of deliverables. All participating construction units shall accelerate the transformation of BIM review deliverables, applying the BIM model 'one model throughout' across the full life cycle of engineering project construction, forming a virtuous cycle of BIM technology application.

January 26, 2025








END

         

          

END

The views expressed are the author's own  Copyright © Zhuwei Architectural Technology

Reproduction without authorization is prohibited

Please credit the source when reposting: Zhuwei Architectural Technology

      Zhuwei Architectural Technology is a new-type technical services company specializing in integrated design optimization, BIM consulting and prefabricated construction design consulting. Our team brings together senior engineers from leading design institutes, former executives of real-estate companies, BIM engineers and prefabrication engineers, delivering integrated design optimization, refined drawing review, BIM consulting with MEP detailing, and prefabricated design services.

      Design optimization consulting: Positioned as an extension and complement to the design management of real-estate developers, we focus on consulting and optimization for civil buildings. Across the whole process — or at key stages required by the client — we control the economy, rationality and safety of the design, eliminating unnecessary cost while measurably improving drawing quality, achieving "lower cost, higher efficiency".

      BIM consulting: Through digital construction technology we help designers reduce errors and improve quality in the design phase, help contractors save cost and plan high-quality MEP installation in the construction phase, and extend BIM models into facility management for the operation phase — in collaboration with mainstream software vendors.

      Prefabricated design consulting: Whole-process design on BIM platforms, using Revit and Tekla for PC detailing. Component geometry and reinforcement are linked parametrically — what you see is what you get. We deliver Industry 4.0-ready drawings with cut-length data for every rebar, and IoT-enabled support for production, storage, transport and installation of PC components.

      Our expert team comes from leading design institutes, with deep technical grounding and extensive experience in dual-track design and optimization; its technical capability and control are industry-leading.

—— This article is auto-synced from the WeChat Official Account “Zhuwei Architectural Technology”. Read the original ——